Previous page | ToC | Next page
Site Identification | Number of Months of Discharge | RT Total |
RT Fail |
DM Total |
DM Fail |
|
---|---|---|---|---|---|---|
Mine/Mill Name | Effluent Discharge Name | |||||
Aurbel (Mine) | Aurbel Final Effluent | 1 | 1 | 1 | ||
Barry (Mine) | V-Notch | 4 | 4 | 4 | ||
Beaufor | Final Effluent | 12 | 4 | 4 | ||
Bell Creek Mine and Mill | Effluent Treatment Plant Discharge | 1 | ||||
Bell Creek Mine and Mill | Phase 1 and 2 Seepage Collection Ditch | 5 | 5 | 5 | ||
Bell Creek Mine and Mill | Phase 3 Seepage Collection Ditch | 4 | 4 | 3 | ||
Bellekeno Mine | Bellekeno 625 Treatment Pond Decant | 4 | 4 | 4 | 1 | |
Birchtree Mine | Birchtree Effluent Treatment Plant | 12 | 4 | 4 | 3 | |
Black Fox Mill Complex / Stock Mine and Mill Complex | Direct Tailings Pond Effluent | 0 | ||||
Black Fox Mill Complex / Stock Mine and Mill Complex | Polishing Pond Effluent | 0 | ||||
Black Fox Mine | Pike River Discharge Point | 12 | 12 | 12 | ||
Black Fox Mine | Salve Creek Transitional Period Discharge Point | 0 | ||||
Brunswick No. 12 | 3333 Final Effluent | 12 | 16 | 2 | 16 | 1 |
Bucko Lake Mine | Settling Pond Discharge | 12 | 12 | 12 | 6 | |
Camflo (Mill) | Final Effluent | 12 | 5 | 5 | ||
Campbell Mine | WETOUT | 6 | 7 | 7 | ||
Cantung Mine | 4-27-2 Culvert | 12 | 4 | 4 | ||
Cantung Mine | Polishing Pond Four | 12 | 11 | 11 | ||
Cantung Mine | Settling Pond 5-2 | 6 | 6 | 6 | ||
Caribou Mine Mill | Polishing Pond Effluent | 0 | ||||
Casa Berardi (Mine) | Final Effluent Point A | 3 | 3 | 3 | ||
Chisel North Mine | Chisel North Mine Discharge | 12 | 4 | 4 | ||
Cigar Lake Project | Station 2.2 | 12 | 5 | 5 | ||
Clavos Mine | Clavos Mine Drainage Area | 0 | ||||
Clavos Mine | Sediment Pond | 0 | ||||
Complexe mιtallurgique Sorel-Tracy | Final Effluent QIT (Point 1.4) | 12 | 12 | 12 | ||
Con Mine | Surveillance Network Program Station 40-1 | 2 | 2 | 2 | 2 | |
Copper Cliff Complex | Copper Cliff Wastewater Treatment Plant | 9 | 5 | 5 | ||
Copper Cliff Complex | Nolin Creek Spillway | 0 | ||||
Copper Cliff Complex | Nolin Creek Wastewater Treatment Plant | 10 | 4 | 4 | ||
Copper Rand (Mine) | Final Discharge Point 2.1c | 12 | 3 | 3 | ||
Crean Hill Mine | Crean Hill Mine Waste Water Treatment System | 8 | 8 | 8 | ||
David Bell Mine | Sedimentation Pond Effluent | 3 | 3 | 3 | ||
Doyon | Pond A Final Effluent (D-203) | 12 | 4 | 4 | ||
Duck Pond Operations | Polishing Pond Effluent | 12 | 13 | 1 | 13 | 2 |
Eagle River Mill | Eagle River Mill | 3 | 3 | 3 | ||
Eagle River Mine | FDP 1 | 12 | 12 | 12 | ||
Endako Mines | En.A1 Tailings Pond 1 South | 11 | 4 | 4 | ||
Endako Mines | En.H1 Tailings Pond 2 Higginbotham | 12 | 4 | 4 | ||
Endako Mines | En.N1 Tailings Pond 1 North | 12 | 4 | 4 | ||
Endako Mines | En.S2 Tailings Pond 2 South | 12 | 4 | 4 | ||
Endako Mines | En.SBC Endako Pit | 12 | 4 | 4 | ||
Endako Mines | En.W2 Denak West Pit | 11 | 8 | 8 | ||
Eskay Creek Mine | Es.D7 Treatment Pond Discharge Point | 12 | 14 | 2 | 14 | 4 |
Eskay Creek Mine | Es.TM1 Tom MacKay Discharge Point | 12 | 4 | 4 | ||
Eskay Creek Mine | Es.W20 Albino Discharge Point | 8 | 8 | 8 | ||
Fire Lake (Mine) | Beaver Pit Spillway (FL-2) | 12 | 12 | 12 | ||
Fire Lake (Mine) | Main Pit (FL-1) | 8 | 8 | 8 | ||
Flin Flon Complex | North Weir Discharge | 12 | 8 | 8 | 1 | |
Garson Mine | Garson Mine | 12 | 4 | 4 | ||
Gιant Dormant (Mine) | GD-E01 Final Effluent Mine Water Pond | 12 | 4 | 4 | ||
Gιant Dormant (Mine) | GD-E03 Polishing Pond 2A | 3 | 3 | 3 | ||
Giant Mine | Surveillance Network Program Station 43-1 | 3 | 3 | 3 | ||
Gibraltar Mine | Gi.FRD Fraser River Diffuser | 6 | 5 | 5 | ||
Golden Giant Mine | Effluent Treatment Plant | 0 | ||||
Golden Giant Mine | ITF Emergency Spillway | 0 | ||||
Golden Giant Mine / David Bell Mine | Sedimentation Pond Effluent | 7 | 7 | 7 | ||
Golden Giant Mine | Waste Water Treatment Plant Effluent | 12 | 12 | 12 | ||
Goldex (Mine) | Final Effluent | 0 | ||||
Goldex (Mine) | Final Effluent Goldex Tailings Pond | 3 | 2 | 2 | ||
Goldex (Mine) | Final Effluent Shaft No. 2 | 0 | ||||
Haley Plant | FDP 1 | 12 | 4 | 4 | ||
Hislop Mine | Sedimentation Pond | 2 | 2 | 2 | ||
Holloway Mine | Final Discharge Point | 2 | 2 | 2 | ||
Horne (Smelter) | Final Effluent Pelletier Sector | 12 | 12 | 12 | ||
Huckleberry Mine | Hu.EZDD East Zone Diversion Ditch | 0 | ||||
Huckleberry Mine | Hu.SC3 Sediment Control Structure 3 | 12 | 4 | 4 | ||
Huckleberry Mine | Hu.SC4 Sediment Control Structure 4 | 12 | 4 | 4 | ||
Huckleberry Mine | Hu.TMF2 Tailings Management Facility 2 Supernatant | 11 | 4 | 4 | 1 | |
Iron Ore Company of Canada Carol Project | Hakim Culvert | 12 | 16 | 1 | 16 | |
Iron Ore Company of Canada Carol Project | Julienne Narrows | 12 | 12 | 12 | ||
Iron Ore Company of Canada Carol Project | MD5 | 8 | 8 | 8 | ||
Island Gold Project | IG-2 | 5 | 5 | 5 | ||
Joe Mann | Polishing Pond Effluent Point 10 | 7 | 3 | 3 | ||
Kemess South Mine | KS.WQ14 Runoff | 12 | 5 | 5 | ||
Kemess South Mine | KS.WQBXL Sedimentation Pond Decant | 4 | 3 | 3 | ||
Key Lake Operation | Station 1.2 Dewatering Discharge to Horsefly Lake | 12 | 4 | 4 | 1 | |
Key Lake Operation | Station 1.4 Mill Effluent to Wolf Lake | 12 | 4 | 4 | ||
Kidd Metallurgical Division | Final Effluent Monitoring Point | 12 | 5 | 5 | ||
Kidd Mining Division | Treatment Pond Final Effluent | 10 | 4 | 4 | ||
Kiena (Mine) | Final Effluent | 7 | 9 | 9 | ||
Lac Bachelor | Parshall Flume | 12 | 12 | 12 | ||
Lac Bloom (Mine) | Mill Site Surface Drainage Pond Effluent | 1 | 1 | 1 | ||
Lac Bloom (Mine) | Mine Site Surface Drainage Sedimentation Pond B2 Effluent | 2 | 2 | 2 | ||
Lac des Iles Mine | FDP 1 | 6 | 6 | 6 | ||
Lac Herbin (Mine) | Final Effluent 1 | 0 | ||||
Lac Herbin (Mine) | Final Effluent 2 | 12 | 4 | 4 | ||
Langlois (Mine) | Main Final Effluent | 10 | 9 | 8 | ||
Lapa (Project) | Final Effluent Sedimentation Pond | 9 | 9 | 9 | ||
Laronde (Mine) | Final Effluent 3A | 12 | 12 | 12 | ||
Lockerby Mine | Number 4 Pond Effluent | 12 | 5 | 5 | ||
Lupin Operations | Lupin Discharge Syphons SNP 925-10 | 0 | ||||
Macassa Mine | C Dam | 12 | 12 | 12 | ||
Magnacon Mine (part of Eagle River Mill) | Magnacon Mine | 0 | ||||
Matagami Mine (Xstrata Zinc Canada Division) | Final Effluent (WLD) | 12 | 12 | 12 | ||
MAX Molybdenum Mine and Mill | MM.SiteD Mine Portal Settling Pond | 0 | ||||
MAX Molybdenum Mine and Mill | MM.SiteI Settling Ponds Decant | 12 | 4 | 4 | ||
MAX Molybdenum Mine and Mill | MM.TP Tailings Pond Discharge | 5 | 5 | 5 | ||
McAlpine Mill | Polishing Pond | 12 | 4 | 4 | ||
McArthur River Operation | Station 2.1 | 12 | 4 | 4 | ||
McArthur River Operation | Station 2.1B | 0 | ||||
McArthur River Operation | Station 2.7 | 12 | 4 | 5 | 1 | |
McClean Lake Operation | CM01-B (JEB Water Treatment Plant) | 12 | 4 | 4 | ||
McClean Lake Operation | CM03 | 0 | ||||
McClean Lake Operation | SC01 (SUE Water Treatment Plant Effluent) | 0 | ||||
McWatters Mine | MWD-2 | 12 | 23 | 12 | 20 | 1 |
Meadowbank Mine | Dewatering Final Discharge 1 | 12 | 12 | 12 | 1 | |
Minto Project | Mi.W3 Runoff Main Water Dam | 11 | 11 | 11 | ||
Mishi Pit (part of Eagle River Mill) | Mishi Pit | 1 | ||||
Montcalm Project | Montcalm Final Effluent | 0 | ||||
Mont-Wright (Mine) | HS-1 | 12 | 5 | 5 | ||
Mont-Wright (Mine) | MS-2 | 7 | 6 | 6 | ||
Mouska (Mine) | Final Effluent | 12 | 4 | 4 | ||
Musselwhite Mine | FDP 1 | 5 | 5 | 5 | ||
Myra Falls Operations | MF.11A Runoff Myra Ponds Effluent | 12 | 4 | 4 | ||
New Britannia Mine / Snow Lake Mine | SWM-03 (Birch Lake Outlet Embankment Decant Discharge) | 1 | 2 | 2 | ||
Niobec (Mine) | Final Effluent | 12 | 4 | 4 | 3 | |
Nugget Pond Mine | Polishing Pond Effluent | 8 | 10 | 10 | ||
Pine Cove Property | Tailings Pond Discharge | 11 | 9 | 9 | ||
Podolsky Mine | Norman North Bog Outlet | 12 | 10 | 10 | ||
Porcupine Gold Mines | Mine Effluent Treatment Plant Dome Mine | 3 | 3 | 3 | ||
Porcupine Gold Mines | Mine Water Storage Pond Dome Mine | 12 | 4 | 4 | ||
Porcupine Gold Mines | Owl Creek Discharge 1 | 0 | ||||
Porcupine Gold Mines | Owl Creek Discharge 2 | 6 | 6 | 6 | ||
Porcupine Gold Mines | Pamour Mine Water | 9 | 3 | 3 | ||
Rabbit Lake Operation | Station 2.3.3 | 12 | 4 | 4 | ||
Raglan (Mine) | DIR-HSA | 0 | ||||
Raglan (Mine) | DIR-SPOON | 3 | 3 | 3 | ||
Raglan (Mine) | DIR-UT | 6 | 6 | 6 | ||
Raglan (Mine) | DIR-Z3 | 8 | 8 | 8 | ||
Red Lake Mine | G1 | 0 | ||||
Red Lake Mine | G2 | 6 | 7 | 7 | ||
Red Lake Mine | Shaft 3 Mine Water Settling Pond | 0 | ||||
Redstone Mine | RSD-2 | 9 | 8 | 9 | ||
Restigouche Mine | Mixing Structure Discharge | 0 | ||||
Rice Lake Gold Mine | FDP1 End of Pipe | 4 | 4 | 4 | 2 | |
Santoy 7 Mine | Santoy 7 Settling Pond | 4 | 4 | 4 | ||
Scozinc Mine Mill | Polishing Pond Outlet | 12 | 11 | 11 | ||
Scozinc Mine Mill | Polishing Pond Outlet 2 | 0 | ||||
Seabee Gold Mine | Final Discharge Point 1.2 | 12 | 4 | 4 | ||
Seabee Gold Mine | Final Discharge Point 1.3 | 0 | ||||
Seabee Gold Mine | Final Discharge Point 1.5 | 3 | 3 | 3 | ||
Shakespeare Nickel Mine | MISA Weir | 0 | ||||
Sigma | Final Effluent EFF1 | 0 | ||||
Snow Lake Mill | Anderson Lake Discharge | 7 | 7 | 7 | ||
Strathcona Tailings Treatment System | Fecunis RR Bridge | 12 | 4 | 4 | ||
Tanco Mine | East Discharge (Phreatic Flow) | 0 | ||||
Tanco Mine | West Discharge (Compliance Point) | 12 | 4 | 4 | ||
Thompson Complex | Misery Weir | 12 | 4 | 4 | ||
Thompson Complex | Station B | 12 | 4 | 4 | ||
Tio (Mine) | Switch South | 12 | 12 | 12 | 1 | |
Tio (Mine) | ECLAC168 | 9 | 9 | 9 | ||
Tio (Mine) | Lake 211.4 | 10 | 10 | 10 | ||
Tio (Mine) | Grondin Effluent (formerly Grondin Lake) | 0 | ||||
Tio (Mine) | Resurgence Leo | 12 | 12 | 12 | ||
Totten Mine | Totten Discharge | 11 | 4 | 4 | ||
Troilus | BS-1 | 0 | ||||
Troilus | BS-2 | 0 | ||||
Troilus | PR-1 | 12 | 4 | 4 | ||
Troilus | PR-2 | 12 | 4 | 4 | ||
Troilus | PR-5 | 12 | 4 | 4 | ||
Troilus | PR-6 | 12 | 4 | 4 | ||
Troilus | PR-7 | 12 | 4 | 4 | ||
Trout Lake Mine | Trout Lake Surface Sump Discharge | 11 | 8 | 8 | 8 | |
Voisey's Bay Mine Mill | Port Site Sedimentation Pond | 4 | 4 | 4 | 1 | |
Voisey's Bay Mine Mill | Sedimentation Pond A Discharge | 0 | ||||
Voisey's Bay Mine Mill | Sedimentation Pond B | 0 | ||||
Voisey's Bay Mine Mill | South of Ovoid Final Discharge Point | 0 | ||||
Voisey's Bay Mine Mill | South Sedimentation Pond | 0 | ||||
Voisey's Bay Mine Mill | Treated Effluent Final Discharge Point | 12 | 47 | 6 | 47 | 43 |
Wabush Mines Joint Venture Scully Mine | East Pit Dewatering East | 4 | 2 | 2 | ||
Wabush Mines Joint Venture Scully Mine | East Pit No. 1 Dewatering | 0 | ||||
Wabush Mines Joint Venture Scully Mine | East Pit No. 2 Dewatering | 9 | 3 | 3 | ||
Wabush Mines Joint Venture Scully Mine | Flora Lake Discharge | 12 | 10 | 10 | ||
Wabush Mines Joint Venture Scully Mine | Knoll Lake Inflow | 12 | 4 | 4 | ||
Wabush Mines Joint Venture Scully Mine | Loadout Ditch Discharge | 1 | 1 | 1 | ||
Wabush Mines Joint Venture Scully Mine | Shops East Discharge | 0 | ||||
Wabush Mines Joint Venture Scully Mine | Shops South Discharge | 0 | ||||
Wabush Mines Joint Venture Scully Mine | Tailings Discharge | 0 | ||||
Wabush Mines Joint Venture Scully Mine | Tailings Line Emergency Dump Basin 1 | 4 | 4 | 4 | ||
Wabush Mines Joint Venture Scully Mine | West Pit Extension Settling Basin | 12 | 4 | 4 | ||
Williams Mine | Polishing Pond Discharge CP 400 | 0 | ||||
Williams Mine | Stormwater Pond CP 102 | 11 | 11 | 11 | ||
Williams Mine | Stormwater Pond CP 0300 | 2 | 2 | 2 | ||
Williams Mine | Stormwater Pond CP 400A | 2 | 2 | 2 | ||
Williams Mine | Treated Effluent CP 0201 | 8 | 8 | 8 | ||
Wolverine Project | Wo.TSF Tailings Storage Facility | 0 | ||||
Yellowjacket Gold Mine | Ye.TSF Tailings Storage Facility | 0 | ||||
Young-Davidson Mine | Mine Water Pond Final Discharge | 5 | 7 | 1 | 7 | |
Summary | 911 | 25 | 908 | 83 |