Transboundary notification: BC Hydro/Calpine Joint Venture

(1) Name and address of proponent:
BC Hydro/Calpine Joint Venture, c/o BC Hydro, 6911 Southpont Drive, Burnaby, BC, V3N 4X8

(2) Latitude and longitude of proposed facility:
49o 14' 00" N,   124o 48' 00" W

(3) Distance to the Canada/U.S. border:
80 km

(4) Brief description of the proposed project (major products, process, capacity, etc):
Natural Gas-fueled combined cycle power plant, generating 265 MW of electricity at 100% load.

(5) For combustion processes, list capacity (tonnes/year), fuel type and grade:
Natural Gas, 265 MW

(6) Contact for technical and design information:
Lachlan Russel,
Phone Number:  (604) 528-2661  
Fax Number:      (604) 528-2905

(7) Estimated annual quantities of the following pollutants released to the atmosphere (tonnes per year):

SO2 :          9*
PM :           39*
NOx :          115*
VOC :          11*
CO :           168*

* At 98% availability

(8) List hazardous air pollutants with emissions estimates (tonnes/year) for any hazardous pollutants with expected annual emission rates of greater than 1 tonne per year:
NH3 61 tonnes/year at 98% availability and 100% load